The Process

Our garden buildings can be easily erected in one day onto a previously prepared concrete base.

The building is bolted to the slab and sealed with sealant to prevent water ingress.

Our trades men manufacture your building and follow the process through to installation, and if you choose a colour from our carefully chosen selection or choose from the extensive Protec Royal colour chart (link to chart) we will leave you a small tin of timber preservative to look after your building.

We want you to be a part of the process to ensure you get exactly what you require.

technical2 technical1

process1 process2  process4 process5 process6

hampton1